Steady progress is being made on the construction of the HBPW GAC Water Treatment Facility.  Click on the link to see a time lapse video of the erection of the sub-structure of the GAC building.  Plans are to have the entire structure enclosed by the end of the year, weather permitting.  HBPW GAC Sub-Structure Construction